TFN Decs via SBR
Prerequisite
*PP_SBR = Y
Report Parameters
![Closed](../../../../Skins/Default/Stylesheets/Images/transparent.gif)
The reporting period. These dates have no relation to when the tax file number declaration details were entered. All tax file declarations with a Send To ATO flag of Y are included.
![Closed](../../../../Skins/Default/Stylesheets/Images/transparent.gif)
Suppliers reference number if applicable can be added.
![Closed](../../../../Skins/Default/Stylesheets/Images/transparent.gif)
This process allows for a test file to be sent to the ATO. The default is 'P'.
Code | Description |
---|---|
P | Production |
T | Test |
Select Run Process